Architectural Modifications
Delays in homeowners requests are generally caused by lack of sufficient detail, illustrations, and samples, or non-compliance with guidelines. Electronically submitting packages via email is the quickest and most efficient way to process homeowners requests. Please note, the committee has up to 60 days to approve work packages.
Note: The forms listed below are in a “.pdf” format and work better when downloaded locally (i.e. desktop, or local folder). To download a form , hover the mouse cursor over the form hyperlink, select the hyperlink by using your right mouse button and select “save link as”. Open the document using Adobe Reader.
Reference material:
Architectural Review Process
Walls and Fences Policy (Effective June 2025)
Pergola Policy
Driveway and Sidewalk Paint Policy
Painting work package:
Painting Request Form
ACC Construction Guidelines
Paint & Other Specs
Paint Color Samples
Exterior modifications work package:
ACC Exterior Modification Form
ACC Construction Guidelines
Sample Site Plan
Siding:
Siding Resources
Report Common Area Problems:
In case of emergency, call (808) 539-9777
Weekends, holidays or outside of
normal business hours.
Mark Deibert, Hawaiian Properties
Phone: (808) 539-9740
Email: [email protected]
